Project 1 - Quartz Tubing Production Facility
This project consists of office space, manufacturing
plant and clean room facilities; all of which
incurred several major scope changes during
the construction process. These design changes
along with the urgency naturally associated
with a production facility demanded vision and
flexibility of the project management and quick
responses for all involved.
Designed and installed complete plant HVAC
system including:
- 500 tons of liquid chillers
- Chilled water piping, pumps and tanks
- Cooling towers
- Custom air handling units
- Exhaust and make-up air fans
- HEPA filter banks
- Class 1,000 clean room
- Sheet metal duct system and air distribution
devices
- DDC control system
- Process piping installation including:
- 5,000+ feet of 316 stainless steel pipe/fittings
- PVC pipe and fittings